Problem:
The client wanted reducing the wastage of material during their glass cutting process.
Solution:
We created a system, connected with the database for the stock quantity of their raw materials. After a project for glass cutting is imported in the system – it checks all the raw materials in stock and interactively shows which materials should be used for minimizing the loss. Achieved wastage of raw material under 10%.
Used Technologies:
Fortran 4